The application
AIC S.A., RMA’s parent company, manufactures stainless steel heat exchangers. Depending on the product type, 50-95% of all welded joints at AIC are laser welds, and the factory ships thousands of kilometers of laser seams every year. At that volume, quality control after the fact is not enough.
The test case was the VC family of shell-and-tube heat exchangers. A set of scanner heads makes over 200 tube-to-tubesheet joints in less than 4 minutes:
| Parameter | Value |
|---|---|
| Joint type | Tube-to-tubesheet (ASME) |
| Tubes | Ø16 × 1 mm, ferritic stainless steel UNS S43932 |
| Tubesheet | 1.6 mm, same material |
| Required penetration | 1.25-1.5 mm from the weld face |
| Tube protrusion | 0.4 ± 0.4 mm above the tubesheet |
| Requirements | ASME Section IV and VIII Div. 1, pressure test 75 PSI |

What goes wrong
The most frequent problem is unrepeatable part position after assembly: tubes protruding too far or too little, and a varying gap between tube and tubesheet hole. Occasionally the process itself drifts - laser power drops because of contaminated optics, shielding gas runs short, or the focal position shifts. Each of these can cause insufficient penetration, an uneven weld face or porosity.
The solution: Precitec LWM
After a series of laboratory tests, the RMA team implemented the Precitec Laser Welding Monitor (LWM) in Q3 2020. Sensors in the optical path of the welding head record three signals at once:
- visible light from the process,
- laser radiation reflected back from the weld,
- thermal radiation in the infrared (SWIR).
Each signal has its own curve over the weld time; together they form a fingerprint of a reference weld. A defined defect or deviation shows up immediately in the recorded data, and the system classifies anomalies as weld defects or process faults (such as too little shielding gas or dirty optics).


What the project showed
- Defects are found during production, so deviations are corrected before they turn into scrap or failed pressure tests.
- Production data links defect type, frequency and position to upstream causes - assembly, part preparation and incoming component quality.
- Quality records are tied to individual welds, which supports traceability over the product’s service life, warranty and service.
What it shows today
Per-joint monitoring with an auditable log is now a standard stage of RMA’s process control in battery welding - the same principle, applied to cell terminals, tabs and busbars instead of tubes. For heat exchanger applications, see heat exchangers.
DOWNLOAD
WHERE THIS APPLIES
KEEP READING
More from Knowledge

KNOWLEDGE · SUCCESS STORY
RMA x PUT Motorsport - Laser Welding a Formula Student Battery
From laboratory to racetrack: RMA joined forces with PUT Motorsport, the Formula Student team of Poznan University of Technology, to build a more efficient and reliable battery for their electric race car - with laser-welded aluminium-copper connections.
Read more →
KNOWLEDGE · CASE STUDY
Bosch Rexroth and RMA - Why the Motion System Decides Battery Weld Quality
A laser weld on a battery cell is only as good as the position of the beam. For the axes that carry the optics in its Battery Welder machines, RMA relies on Bosch Rexroth linear technology with integrated position measurement. Here is what that choice changed - for us and for the people who run the machines.
Read more →
REFERENCE PROJECT · CUSTOM MACHINE
Robotic Laser Welding Cell for Linear Drains - with Inline Weld Depth Monitoring
A robot picks up a stainless steel linear drain up to 1.3 m long, presents it to a fixed laser welding head and turns it through a full circumferential weld - while an inline sensor measures the weld depth along the entire seam. A custom RMA cell for welding, marking and quality control in one enclosure.
Read more →